Graham + Sibbald, Chartered Surveyors and Property Consultants are thrilled to announce the promotion of Billy Overton MRICS to Associate. Billy joined the Graham + Sibbald Bristol office in December 2022 as a Graduate Surveyor and later passed his APC in 2023. Billy works in the Building Surveying Team along with Director of Building Surveying…

Advisory Services for Extension Proposals at Baxter Healthcare Facility

Advisory Services for Extension Proposals at Baxter Healthcare Facility

Graham + Sibbald (G+S) were approached by ABC Property Investments Ltd (the Landlord) to provide advice on a tenant’s proposals to build an extension on their existing facility. The existing building is a 27,000 sq.ft manufacturing facility leased by Baxter Healthcare, a pharmaceutical manufacturer. They wanted to install a new production line and submitted plans…

Project Management, Design and Cost Control Services, Loch Lomond

Project Management, Design and Cost Control Services, Loch Lomond

Graham + Sibbald (G+S) were appointed to  provide architectural, project management and cost control services  in connection with a proposed extensive refurbishment of a hostel property located in a prominent but remote site on the east side of Loch LomondRowardennan Hostel, formerly known as Rowardennan Lodge, is operated by Hostelling Scotland, having previously been gifted…

Project Management, Design and Cost Control Services, Braemar

Project Management, Design and Cost Control Services, Braemar

Graham + Sibbald (G+S) were appointed to  provide architectural, project management and cost control services  in connection with a proposed extensive refurbishment of a hostel property located on the immediate outskirts of the Highland town of Braemar, some 10 miles north of the Glenshee Ski Centre.Braemar Hostel is operated by Hostelling Scotland, and contains numerous…

Defect Analysis at Primary School in South Ayrshire

Defect Analysis at Primary School in South Ayrshire

South Ayrshire Council had concerns with the quality of a retaining wall formed around a new carpark. Graham + Sibbald inspected the wall and reviewed all relevant contract documents, British Standards, Eurocodes, and workmanship requirements to allow preparation and issue of Defects Analysis Report.KEY CHALLENGESOur Team had to overcome the time restrictions imposed for this…

Office Fit-Out Scheme to Suite 1A Burlington House, Liverpool

Office Fit-Out Scheme to Suite 1A Burlington House, Liverpool

Graham + Sibbald were appointed to revitalise a large vacant suite within Burlington House, a multi-storey office building in Crosby, Liverpool. This vacant suite, had recently been vacated following a relocation of the previous tenant, with the existing finishes old and outdated, thereby requiring a complete transformation to meet modern tenant needs and attract smaller…

Re-Instatement Cost Assessment

Re-Instatement Cost Assessment

Graham + Sibbald (G+S) were appointed to provide advice in connection with a re-instatement cost assessment of a historic public house and office premises in Central London. The Public House is of considerable historical interest as extracted :- “ALDGATE HIGH STREET, EC3 1. 5002 (South Side) No 47 (Hoop and Grapes Public House) TQ 3381…